FINAL EIA REPORT
-
BASELINE TECHNICAL REPORTS (Report are available in English only)
-
Physical Environment:
-
Air Quality (Sisson Project: Baseline Ambient Air Quality Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
-
Sound Quality (Sisson Project: Baseline Sound Quality Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
-
Metals in Soil and Biota (Sisson Project: Baseline Metal Concentrations in Soil and Biota Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
-
Water Quality (Baseline Water Quality Report, Sisson Project. Prepared for Northcliff Resources Ltd. by Knight Piésold Ltd., Vancouver, British Columbia. Report number VA101-447/4-1, Rev 0, August 31, 2012.)
-
Hydrometeorology (2011 Hydrometeorology Report, Sisson Project. Prepared for Northcliff Resources Ltd. by Knight Piésold Ltd., Vancouver, British Columbia. Report number: VA101-447/3-1, Rev 1, August 23, 2012.)
-
Hydrogeology (Baseline Hydrogeology Report, Sisson Project. Prepared for Northcliff Resources Ltd. by Knight Piésold., Vancouver, British Columbia. Report number VA101-447/2-8, Rev 0, January 2, 2013.)
-
-
Biological Environment:
-
Vegetation and Wetlands (Sisson Project: Baseline Vegetated and Wetland Environments Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
-
Aquatic Environment - Project Site (Sisson Project: Baseline Aquatic Environment Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
-
Aquatic Environment - Transmission Line (Sisson Project: Baseline Aquatic Field Surveys of the Corridor for the Relocation of the Existing 345 kV Transmission Line and Fire Road. Prepared for Northcliff Resources Ltd. February 4, 2013.)
-
Wildlife and Wildlife Habitat (Sisson Project: Baseline Wildlife and Wildlife Habitat Technical Report Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
-
Winter Wildlife Surveys (Sisson Project: Winter Wildlife Surveys 2012. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. February 15, 2013.)
-
-
Human Environment:
-
Socioeconomic Environment (Sisson Project: Baseline Socioeconomic Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
-
Heritage Resources (Sisson Project: Baseline Heritage Resources Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
-
-
-
TECHNICAL STUDY REPORTS
-
Predictive Water Quality Modelling, 2013 (Predictive Water Quality Modelling. Prepared for Northcliff Resources Ltd. by Knight Piésold Ltd., Vancouver, British Columbia. Report number VA101-447/2-9, Rev 1, July 3, 2013.)
-
Predictive Water Quality Modelling, 2014 (Sisson Project - Updated Predicted Water Quality Model Results. Memorandum prepared for Sisson Mines Ltd. by Knight Piésold Ltd., Vancouver, British Columbia. File No. VA101-447/5-A.01. Cont. No. VA14-00403. March 5, 2014.)
-
Metal Leaching and Acid Rock Drainage Potential Characterization, 2013 (Sisson Project: Metal Leaching and Acid Rock Drainage Potential Characterization. Prepared for Northcliff Resources Ltd. by SRK Consulting (Canada) Inc. Report number 1CN019.000, August 2013.)
-
Economic Benefits from the Sisson Project (Assessment of Economic Benefits Arising From the Construction and Operation of the Sisson Mine. Prepared for Northcliff Resources Ltd. by EcoTec Consultants, Québec. Reviewed by Wade Locke Economic Consulting. February 2013.)
-
Transportation Study (Sisson Project Road Transportation Study - Final Report. Prepared for Northcliff Resources Ltd. by exp Services Inc., Fredericton, New Brunswick. January 2013.)
-
Transportation Study Addendum (Memorandum: Sisson Project Road Transportation Study Addendum. No Operation Phase Bussing. Prepared for Northcliff Resources Ltd. by exp Services Inc., Fredericton, New Brunswick. March 1, 2013.)
-
-
OTHER DOCUMENTS
-
Final EIA Terms of Reference (Sisson Project: Final Terms of Reference for an Environmental Impact Assessment. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. April 16, 2012.)
-
Canadian National Instrument 43-101 Technical Report (Canadian National Instrument 43-101 Technical Report on the Sisson Project, New Brunswick, Canada. Prepared by Samuel Engineering, Inc. on behalf of Northcliff Resources Ltd., Greenwood Village, Colorado. January 22, 2013.)
-
Heritage Mitigation Plan, 2014 (Heritage Mitigation Plan for the Sisson Project. Report prepared for Sisson Mines Ltd. by Stantec Consulting Ltd., Fredericton, NB. Project No. 121811420. July 4, 2014.)
-