1. FINAL EIA REPORT

  2. BASELINE TECHNICAL REPORTS

    • Physical Environment:
      • Air Quality (Sisson Project: Baseline Ambient Air Quality Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
      • Sound Quality (Sisson Project: Baseline Sound Quality Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
      • Metals in Soil and Biota (Sisson Project: Baseline Metal Concentrations in Soil and Biota Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
      • Water Quality (Baseline Water Quality Report, Sisson Project. Prepared for Northcliff Resources Ltd. by Knight Pi�sold Ltd., Vancouver, British Columbia. Report number VA101-447/4-1, Rev 0, August 31, 2012.)
      • Hydrometeorology (2011 Hydrometeorology Report, Sisson Project. Prepared for Northcliff Resources Ltd. by Knight Pi�sold Ltd., Vancouver, British Columbia. Report number: VA101-447/3-1, Rev 1, August 23, 2012.)
      • Hydrogeology (Baseline Hydrogeology Report, Sisson Project. Prepared for Northcliff Resources Ltd. by Knight Pi�sold Ltd., Vancouver, British Columbia. Report number VA101-447/2-8, Rev 0, January 2, 2013.)
    • Biological Environment:
      • Vegetation and Wetlands (Sisson Project: Baseline Vegetated and Wetland Environments Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
      • Aquatic Environment - Project Site (Sisson Project: Baseline Aquatic Environment Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
      • Aquatic Environment - Transmission Line (Sisson Project: Baseline Aquatic Field Surveys of the Corridor for the Relocation of the Existing 345 kV Transmission Line and Fire Road. Prepared for Northcliff Resources Ltd. February 4, 2013.)
      • Wildlife and Wildlife Habitat (Sisson Project: Baseline Wildlife and Wildlife Habitat Technical Report Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
      • Winter Wildlife Surveys (Sisson Project: Winter Wildlife Surveys 2012. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. February 15, 2013.)
    • Human Environment:
      • Socioeconomic Environment (Sisson Project: Baseline Socioeconomic Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
      • Heritage Resources (Sisson Project: Baseline Heritage Resources Technical Report. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. June 1, 2012.)
  3. TECHNICAL STUDY REPORTS

    • Predictive Water Quality Modelling, 2013 (Predictive Water Quality Modelling. Prepared for Northcliff Resources Ltd. by Knight Pi�sold Ltd., Vancouver, British Columbia. Report number VA101-447/2-9, Rev 1, July 3, 2013.)
    • Predictive Water Quality Modelling, 2014 (Sisson Project - Updated Predicted Water Quality Model Results. Memorandum prepared for Sisson Mines Ltd. by Knight Pi�sold Ltd., Vancouver, British Columbia. File No. VA101-447/5-A.01. Cont. No. VA14-00403. March 5, 2014.)
    • Metal Leaching and Acid Rock Drainage Potential Characterization, 2013 (Sisson Project: Metal Leaching and Acid Rock Drainage Potential Characterization. Prepared for Northcliff Resources Ltd. by SRK Consulting (Canada) Inc. Report number 1CN019.000, August 2013.)
    • Economic Benefits from the Sisson Project (Assessment of Economic Benefits Arising From the Construction and Operation of the Sisson Mine. Prepared for Northcliff Resources Ltd. by EcoTec Consultants, Qu�bec, Qu�bec. Reviewed by Wade Locke Economic Consulting. February 2013.)
    • Transportation Study (Sisson Project Road Transportation Study - Final Report. Prepared for Northcliff Resources Ltd. by exp Services Inc., Fredericton, New Brunswick. January 2013.)
    • Transportation Study Addendum (Memorandum: Sisson Project Road Transportation Study Addendum. No Operation Phase Bussing. Prepared for Northcliff Resources Ltd. by exp Services Inc., Fredericton, New Brunswick. March 1, 2013.)
  4. OTHER DOCUMENTS

    • Final EIA Terms of Reference (Sisson Project: Final Terms of Reference for an Environmental Impact Assessment. Prepared for Northcliff Resources Ltd. by Stantec Consulting Ltd., Fredericton, New Brunswick. April 16, 2012.)
    • Canadian National Instrument 43-101 Technical Report (Canadian National Instrument 43-101 Technical Report on the Sisson Project, New Brunswick, Canada. Prepared by Samuel Engineering, Inc. on behalf of Northcliff Resources Ltd., Greenwood Village, Colorado. January 22, 2013.)
    • Heritage Mitigation Plan, 2014 (Heritage Mitigation Plan for the Sisson Project. Report prepared for Sisson Mines Ltd. by Stantec Consulting Ltd., Fredericton, NB. Project No. 121811420. July 4, 2014.)